NREMT Practice Questions
HEAL100 · Other
HEAL100 Health Care — exam and revision material · Other
Updated today
Health Care exam material, 32 pages. Originally published on StudyMerit.
See the first 3 pages exactly as they appear in the document.
V IRGINIA DEQ SWM PLAN REVIEW ER CERTIFICATION EXAM QUESTIONS AND 100% VERIFIED ANSWERS (NEWEST) 300 PRACTICE QUESTIONS AND ANSWERS 1. What is the primary state regulation governing stormwater management in Virginia? Answer: The Virginia Stormwater Management Act (Code of Virginia § 62.1 - 44.15:24 et seq.) and the Virginia Stormwater Management Program (VSMP) Regulation (9VAC25 - 870). 2. What federal law requires stormwater management programs? Answer: The Clean Water Act, speci fically Section 402 which establishes the National Pollutant Discharge Elimination System (NPDES) program. 3. When did Virginia receive delegation of the federal stormwater program? Answer: Virginia received delegation of the federal stormwater program on June 30, 2013. 4. What is the minimum disturbed area threshold for requiring a VSMP permit? Answer: Land disturbing activities that disturb 2,500 square feet or more of land area require a VSMP permit. 5. What is the definition of "land disturbing activity " under VSMP? Answer: A man - made change to the land surface that potentially changes its runoff characteristics including clearing, grading, excavating, filling, or other alteration of the land surface. 6. Which projects are exempt from VSMP permit require ments?
Answer: Projects such as individual single - family detached residential structures with <1 acre disturbance, certain agricultural activities, emergency work, and routine maintenance activities. 7. What is the role of the Virginia Stormwater Managemen t Program Authority (VSMPA)? Answer: The VSMPA is the entity authorized by DEQ to administer the VSMP, including permit issuance, plan review, inspection, and enforcement. 8. How many VSMPAs are currently operating in Virginia? Answer: There are approximat ely 50+ VSMPAs operating in Virginia, including localities and regional authorities. 9. What is required for a locality to become a VSMPA? Answer: The locality must submit an application to DEQ demonstrating adequate legal authority, technical capability, administrative capability, and financial resources. 10. What is the maximum civil penalty for VSMP violations? Answer: The maximum civil penalty is $32,500 per violation per day under current regulations. 11. What is the difference between a General Permit and an Individual Permit? Answer: General Permits cover common categories of activities with standardized requirements, while Individual Permits are issued for unique or complex projects requiring site - specific conditions. 12. What is the General Permit for Discharges of Stormwater from Construction Activities? Answer: VAG02 is the general permit that covers construction activities disturbing one acre or more of land area. 13. What is the General Permit for Discharges of Sto rmwater from Small Municipal Separate Storm Sewer Systems? Answer: VAG13 is the general permit for MS4s serving populations under 100,000. 14. What is a NOI in the VSMP context?
Answer: Notice of Intent - the application form required to obtain coverage un der a general permit. 15. What is a NOT in the VSMP context? Answer: Notice of Termination - the form required to terminate coverage under a general permit when the project is complete. 16. What is the standard review timeframe for a complete VSMP permit a pplication? Answer: DEQ or the VSMPA must act on a complete application within 60 days of receipt. 17. What constitutes a "complete" application? Answer: An application containing all required forms, fees, plans, calculations, and supporting documentation as specified in the regulations. 18. What is the public notice requirement for VSMP permits? Answer: Individual permits require a 30 - day public comment period with notice published in a newspaper of general circulation. 19. What is the appeal process for V SMP permit decisions? Answer: Appeals may be filed with the State Water Control Board within 30 days of the permit decision. 20. What is the duration of a VSMP permit? Answer: VSMP permits are typically valid for 5 years from the date of issuance. 21. What is required for permit transfers? Answer: Permit transfers require written notification to DEQ or the VSMPA and may require formal modification depending on the scope of changes. 22. What triggers a permit modification? Answer: Significant changes to the approved plan, ownership changes, or changes in site conditions may require permit modification. 23. What is the difference between a minor and major permit modification? Answer: Minor modifications don't require public notice and have expedited review, wh ile major modifications require full review and public notice.
29 more pages after this
You’ve read 3 of 32. Unlock once and it stays in your library — and if the rest doesn’t match what you just read, you get a refund.
HEAL100 · Other
D218 · Western Governors University
HEAL100 · Other
$10.00
Yours permanently