Skip to content
CramShare
FreePractice exam

Xactimate Level 1 (LV1) Certification Exam / Xactimate Level 2 (LV2) Certification Test Actual Test

HEAL100 Health Care — exam and revision material · Other

Updated today

Health Care exam material, 10 pages. Originally published on StudyMerit.

Pages
10
Academic year
2025/2026
Language
English

What’s included

Preview 3 of 10 pages

See the first 3 pages exactly as they appear in the document.

Read page 1 as text

XACTIMATE LEVEL 1 & LEVEL 2 CERTIFICATION EXAM 2024 ACTUAL QUESTIONS AND CORRECT ANSWERS LEVEL 1 The only way to create an Xactimate estimate is through XactAnalysis. False With an Internet connection, you can download and upload a XactAnalysis assignment. True What are the steps in the 4-Step Estimating Process? 1.Claim Info 2.Sketch 3.Estimate Items 4.Complete It is mandatory to follow the 4-Step Estimating Process in its exact order. False At the fundamental level of learning, it is recommended to add or create a project from the Control Center tab. False Multiple addresses can be added through Insured Info. True There are three coverage types available in the Coverage/Loss section. Name them a. Dwelling b. Other Structures c. Contents A deductible can be applied across all coverages or specific coverage only

Read page 2 as text

True Xactware surveys prices from contractors in the field. The unit prices the contractors provide are ______________ of costs and fees associated with performing the task, but ____________ of any general overhead and profit percentage. inclusive, exclusive Image types that can be imported into a Company Header includes .tif, .gif, and .png. False Name the four sections that comprise the Sketch window: 1. Tools 2. Search 3. Sketch Workspace 4. Items It is possible to view multiple levels of your Sketch diagram in 3-D View. True You can use the Missing Wall tool to delete a wall. True Changing the room dimensions is the same thing as changing the room shape False What color must the measurement be to click on it and type it in? Blue When typing in a foot and inch measurement, a comma can be used to separate the two numbers, i.e., 5,6. True The ability to deduct for an opening (door, window, missing wall) can be found where? Properties Window Before dragging a wall handle, holding down the ______ key on your keyboard will create a new room. Control

Read page 3 as text

What does a number in parentheses represent when it follows a room name? e.g., Closet (1) Subgroup The Undo button can only be used twice. False The variable PF stands for floor perimeter. True This Quick Entry field represents a two-letter code for each item quantity. For example, SF (square feet), EA (each), UN (unit), etc. Unites of Measure Which Quick Entry field determines the item's unit price by describing exactly what is to happen to that specified item? Item Activity (Act) Field Two feature options appear once you click on an item in a Reference Search image. Which ones are they? Refined Topics and Search Results When an estimate is marked Completed, you can still modify it. False In some instances, you may leave items in violation if they are correct for the scope of the estimate. True If you want to make changes to an estimate that has a status of completed, you must: Change the estimate status to In Progress. Once a roof has been placed, the roof type can be changed in the _________ Window Properties What variable can be used to place drip edge around the entire perimeter of a roof? P The Square Break tool can be used on roofs the same way it is used on rooms

That’s the free preview

You’ve read 3 of 10 pages. The whole document is yours with a free account, and it stays in your library.

Free

With a free account