Chapter 2 – The Project Management Information Technology Context
True / False
1. Project managers should lead projects in isolation in order to truly serve the needs of the organization.
a. True
b. False
ANSWER:
False
RATIONALE:
Feedback: Even though projects are temporary and intended to provide a unique product or
service, you cannot run projects in isolation. If project managers lead projects in isolation, it
is unlikely that they will ever truly serve the needs of the organization.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.49
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.9 – LO: 2-1
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
A Systems View of Project Management
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
4/27/2018 3:48 PM
2. Using a systems approach is critical to successful project management.
a. True
b. False
ANSWER:
True
RATIONALE:
Feedback: Using a systems approach is critical to successful project management. If top
management and project managers are to understand how projects relate to the whole
organization, they must follow a systems philosophy.
POINTS:
1
DIFFICULTY:
Difficulty: Moderate
REFERENCES:
p.49
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.9 – LO: 2-1
NATIONAL STANDARDS: United States – BUSPROG: Analytic
TOPICS:
A Systems View of Project Management
KEYWORDS:
Bloom’s: Comprehension
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/7/2018 7:23 PM
3. Systems analysis addresses the business, technological, and organizational issues associated with creating, maintaining,
and modifying a system.
a. True
b. False
ANSWER:
False
Copyright Cengage Learning. Powered by Cognero.
Page 1
Chapter 2 – The Project Management Information Technology Context
RATIONALE:
Feedback: Systems management addresses the business, technological, and organizational
issues associated with creating, maintaining, and modifying a system.
POINTS:
1
DIFFICULTY:
Difficulty: Moderate
REFERENCES:
p. 49
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.9 – LO: 2-1
NATIONAL STANDARDS: United States – BUSPROG: o Reflective Thinking – BUSPROG: Analytic skills: Statistics
and Management Science
TOPICS:
A Systems View of Project Management
KEYWORDS:
Bloom’s: Comprehension
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/7/2018 7:24 PM
4. Project managers and their teams must recognize the effects of any project on the interests and needs of the entire
system or organization instead of focusing on the immediate concerns of the project.
a. True
b. False
ANSWER:
True
RATIONALE:
Feedback: Although it is easier to focus on the immediate and sometimes narrow concerns of
a particular project, project managers and other staff must recognize the effects of any project
on the interests and needs of the entire system or organization.
POINTS:
1
DIFFICULTY:
Difficulty: Moderate
REFERENCES:
p.50
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.9 – LO: 2-1
NATIONAL STANDARDS: United States – BUSPROG: Analytic
TOPICS:
A Systems View of Project Management
KEYWORDS:
Bloom’s: Comprehension
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/7/2018 7:26 PM
5. When you separate business and organizational issues from project management planning, you do a better job of
ensuring project success.
a. True
b. False
ANSWER:
False
RATIONALE:
Feedback: When you integrate business and organizational issues into project management
planning and look at projects as a series of interrelated phases, you do a better job of ensuring
project success.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
Copyright Cengage Learning. Powered by Cognero.
Page 2
Chapter 2 – The Project Management Information Technology Context
REFERENCES:
p.51
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.9 – LO: 2-1
NATIONAL STANDARDS: United States – BUSPROG: Analytic
TOPICS:
A Systems View of Project Management
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
4/27/2018 3:48 PM
6. According to the symbolic frame, the most important aspect of any event in an organization is not what actually
happened, but what it means.
a. True
b. False
ANSWER:
True
RATIONALE:
Feedback: The symbolic frame focuses on symbols and meanings. In this frame, the most
important aspect of any event in an organization is not what actually happened, but what it
means.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.53
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.10 – LO: 2-2
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Understanding Organizations
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
4/27/2018 3:48 PM
7. Most colleges and universities have very strong functional organizations.
a. True
b. False
ANSWER:
True
RATIONALE:
Feedback: most colleges and universities have very strong functional organizations. Only
faculty members in the business department teach business courses; faculty in the history
department teach history; faculty in the art department teach art, and so on.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.54
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.10 – LO: 2-2
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
Copyright Cengage Learning. Powered by Cognero.
Page 3
Chapter 2 – The Project Management Information Technology Context
TOPICS:
KEYWORDS:
DATE CREATED:
DATE MODIFIED:
Understanding Organizations
Bloom’s: Knowledge
4/27/2018 3:48 PM
5/7/2018 7:31 PM
8. An organization that uses a project organizational structure earns their revenue primarily from performing projects for
other groups under contract.
a. True
b. False
ANSWER:
True
RATIONALE:
Feedback: A project organizational structure is hierarchical, but instead of functional
managers or vice presidents reporting to the CEO, program managers report to the CEO.
Their staffs have a variety of skills needed to complete the projects within their programs. An
organization that uses this structure earns its revenue primarily from performing projects for
other groups under contract.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.54
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.10 – LO: 2-2
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Understanding Organizations
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
4/27/2018 3:48 PM
9. Project managers in matrix organizations have staff from various functional areas working on their projects.
a. True
b. False
ANSWER:
True
RATIONALE:
Feedback: Project managers in matrix organizations have staff from various functional areas
working on their projects.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p. 55
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.10 – LO: 2-2
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Understanding Organizations
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
4/27/2018 3:48 PM
Copyright Cengage Learning. Powered by Cognero.
Page 4
Chapter 2 – The Project Management Information Technology Context
10. The project organizational structure is the most efficient choice for most IT projects.
a. True
b. False
ANSWER:
False
RATIONALE:
Feedback: The project organizational structure is often inefficient for the company as a
whole. Assigning staff full time to a project often creates underutilization and misallocation
of staff resources.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p. 55
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.10 – LO: 2-2
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Understanding Organizations
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/7/2018 7:35 PM
11. Most people believe that the underlying causes of many companiesโ problems can be traced to its organizational
structure.
a. True
b. False
ANSWER:
False
RATIONALE:
Feedback: Organizational culture is very powerful, and many people believe the underlying
causes of many companiesโ problems are not in the organizational structure or staff; they are
in the culture.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.57
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.10 – LO: 2-2
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Understanding Organizations
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
4/27/2018 3:48 PM
12. The same organization can have different subcultures.
a. True
b. False
ANSWER:
True
RATIONALE:
Feedback: It is also important to note that the same organization can have different
subcultures. The IT department may have a different organizational culture than the finance
Copyright Cengage Learning. Powered by Cognero.
Page 5
Chapter 2 – The Project Management Information Technology Context
department, for example.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.57
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.10 – LO: 2-2
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Understanding Organizations
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
4/27/2018 3:48 PM
13. An organizational culture with strong unit integration makes the project manager’s job more difficult.
a. True
b. False
ANSWER:
False
RATIONALE:
Feedback: Most project managers strive for strong unit integration to deliver a successful
product, service, or result. An organizational culture with strong unit integration makes the
project manager’s job easier.
POINTS:
1
DIFFICULTY:
Moderate
REFERENCES:
p.57
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.10 – LO: 2-2
NATIONAL STANDARDS: United States – BUSPROG: o Reflective Thinking – BUSPROG: Analytic skills: Statistics
and Management Science
TOPICS:
Understanding Organizations
KEYWORDS:
Bloom’s: Comprehension
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/14/2018 9:58 AM
14. Project work is most successful in an organizational culture where activities are organized around individuals.
a. True
b. False
ANSWER:
False
RATIONALE:
Feedback: Project work is most successful in organizations in which work activities are
organized around groups or teams, rather than individuals. An organizational culture that
emphasizes group work is best for managing projects.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.57
QUESTION TYPE:
True / False
Copyright Cengage Learning. Powered by Cognero.
Page 6
Chapter 2 – The Project Management Information Technology Context
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.10 – LO: 2-2
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Understanding Organizations
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
4/27/2018 3:48 PM
15. Internal stakeholders include groups affected by the project such as government officials or concerned citizens.
a. True
b. False
ANSWER:
False
RATIONALE:
Feedback: External project stakeholders include the projectโs customers (if they are external
to the organization), competitors, suppliers, and other external groups potentially involved in
the project or affected by it, such as government officials or concerned citizens.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.58
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.11 – LO: 2-3
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Focusing on Stakeholder Needs
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
4/27/2018 3:48 PM
16. Project managers must take adequate time to identify, understand, and manage relationships with all project
stakeholders.
a. True
b. False
ANSWER:
True
RATIONALE:
Feedback: Because the purpose of project management is to meet project requirements and
satisfy stakeholders, it is critical that project managers take adequate time to identify,
understand, and manage relationships with all project stakeholders.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.58-59
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.11 – LO: 2-3
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Focusing on Stakeholder Needs
KEYWORDS:
Bloom’s: Knowledge
Copyright Cengage Learning. Powered by Cognero.
Page 7
Chapter 2 – The Project Management Information Technology Context
DATE CREATED:
DATE MODIFIED:
4/27/2018 3:48 PM
4/27/2018 3:48 PM
17. The best way to sustain a project is to withhold the required money, human resources, and visibility for the project.
a. True
b. False
ANSWER:
False
RATIONALE:
Feedback: The best way to kill a project is to withhold the required money, human resources,
and visibility.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.60
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.11 – LO: 2-3
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Focusing on Stakeholder Needs
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
4/27/2018 3:48 PM
18. Project managers must have cooperation from people in other parts of the organization.
a. True
b. False
ANSWER:
True
RATIONALE:
Feedback: Project managers must have cooperation from people in other parts of the
organization. If certain functional managers are not responding to project managersโ requests
for necessary information, top management must step in to encourage the functional
managers to cooperate.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.60
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.11 – LO: 2-3
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Focusing on Stakeholder Needs
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
4/27/2018 3:48 PM
19. Standards and guidelines to follow when performing project management must be devised by top management.
a. True
b. False
ANSWER:
True
Copyright Cengage Learning. Powered by Cognero.
Page 8
Chapter 2 – The Project Management Information Technology Context
RATIONALE:
Feedback: The content of a project management plan and instructions for providing status
information might seem like common sense to senior managers, but many new IT project
managers have never created plans or created a nontechnical status report. Top management
must support the development of these standards and guidelines, and encourage or even
enforce their use.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.62
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.11 – LO: 2-3
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Focusing on Stakeholder Needs
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
4/27/2018 3:48 PM
20. It is much more expensive to make major changes to a project during the earlier phases.
a. True
b. False
ANSWER:
False
RATIONALE:
Feedback: In early phases of a project life cycle, resource needs are usually lowest and the
level of uncertainty is highest. It is much more expensive to make major changes to a project
during latter phases.
POINTS:
1
DIFFICULTY:
Difficulty: Moderate
REFERENCES:
p.63
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.12 – LO: 2-4
NATIONAL STANDARDS: United States – BUSPROG: Analytic
TOPICS:
Project Phases and the Project Life Cycle
KEYWORDS:
Bloom’s: Comprehension
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
4/27/2018 3:48 PM
21. The last phase of the traditional project life cycle is the implementation phase.
a. True
b. False
ANSWER:
False
RATIONALE:
Feedback: The last phase of the traditional project life cycle is finishing the project. It focuses
on ensuring that project requirements were met and that the project sponsor approves
completion of the project.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
Copyright Cengage Learning. Powered by Cognero.
Page 9
Chapter 2 – The Project Management Information Technology Context
REFERENCES:
p.63
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.12 – LO: 2-4
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Project Phases and the Project Life Cycle
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/7/2018 7:49 PM
22. An organization usually commits more money as a project continues, therefore a management review should occur
after each phase to evaluate progress, potential success, and continued compatibility with organizational goals.
a. True
b. False
ANSWER:
True
RATIONALE:
Feedback: Because the organization usually commits more money as a project continues, a
management review should occur after each phase to evaluate progress, potential success,
and continued compatibility with organizational goals.
POINTS:
1
DIFFICULTY:
Difficulty: Moderate
REFERENCES:
p.66
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.12 – LO: 2-4
NATIONAL STANDARDS: United States – BUSPROG: Analytic
TOPICS:
Project Phases and the Project Life Cycle
KEYWORDS:
Bloom’s: Comprehension
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
4/27/2018 3:48 PM
23. The nature of hardware development projects is more diverse than software-oriented projects.
a. True
b. False
ANSWER:
False
RATIONALE:
Feedback: The nature of software development projects is even more diverse than hardwareoriented projects. A software development project might include creating a simple, standalone Microsoft Excel or Access application, or a sophisticated, global e-commerce system
that uses state-of-the-art programming languages and runs on multiple platforms.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.67-68
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.13 – LO: 2-5
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
Copyright Cengage Learning. Powered by Cognero.
Page 10
Chapter 2 – The Project Management Information Technology Context
TOPICS:
KEYWORDS:
DATE CREATED:
DATE MODIFIED:
The Context of Information Technology Projects
Bloom’s: Knowledge
4/27/2018 3:48 PM
4/27/2018 3:48 PM
24. The team members of a virtual team are all of the same nationality.
a. True
b. False
ANSWER:
False
RATIONALE:
Feedback: A virtual team is a group of people who work together despite time and space
boundaries using communication technologies. Team members might all work for the same
company in the same country, or they might include employees as well as independent
consultants, suppliers, or even volunteers providing their expertise from around the globe.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.71
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.14 – LO: 2-6
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Recent Trends Affecting Information Technology Project Management
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
4/27/2018 3:48 PM
25. Leadership style has no impact on the success of virtual teams.
a. True
b. False
ANSWER:
False
RATIONALE:
Feedback: The project managerโs leadership style affects all teams, especially virtual ones.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.72
QUESTION TYPE:
True / False
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.14 – LO: 2-6
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Recent Trends Affecting Information Technology Project Management
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
4/27/2018 3:48 PM
Multiple Choice
26. Projects must operate in a broad organizational environment, and project managers need to consider projects within
Copyright Cengage Learning. Powered by Cognero.
Page 11
Chapter 2 – The Project Management Information Technology Context
the greater organizational context. Which approach describes the holistic view of carrying out projects within the context
of the organization?
a. Linear analysis
b. Systems thinking
c. Reductionism
d. The silo approach
ANSWER:
b
RATIONALE:
Feedback: To handle complex situations effectively, project managers need to take a holistic
view of a project and understand how it relates to the larger organization. Systems thinking
describes this holistic view of carrying out projects within the context of the organization.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.49
QUESTION TYPE:
Multiple Choice
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.9 – LO: 2-1
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
A Systems View of Project Management
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/8/2018 11:03 AM
27. Which problem-solving approach requires defining the scope of a system, dividing it into its components, and then
identifying and evaluating its problems, opportunities, constraints, and needs?
a. Linear programming
b. Independent component analysis
c. Principal component analysis
d. Systems analysis
ANSWER:
d
RATIONALE:
Feedback: Systems analysis is a problem-solving approach that requires defining the scope of
the system, dividing it into components, and then identifying and evaluating its problems,
opportunities, constraints, and needs.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.49
QUESTION TYPE:
Multiple Choice
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.9 – LO: 2-1
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
A Systems View of Project Management
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/7/2018 9:07 PM
28. Which perspective of an organization focuses on different groupsโ roles and responsibilities in order to meet the goals
and policies set by top management?
a. Structural frame
b. Human resources frame
c. Political frame
d. Symbolic frame
ANSWER:
a
Copyright Cengage Learning. Powered by Cognero.
Page 12
Chapter 2 – The Project Management Information Technology Context
RATIONALE:
Feedback: The structural frame deals with how the organization is structured (usually
depicted in an organizational chart) and focuses on different groupsโ roles and responsibilities
to meet the goals and policies set by top management. This frame is very rational and focuses
on coordination and control.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.52
QUESTION TYPE:
Multiple Choice
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.10 – LO: 2-2
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Understanding Organizations
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/7/2018 9:09 PM
29. The _____ frame of an organization focuses on providing harmony between the needs of the organization and the
needs of people.
a. structural
b. human resources
c. political
d. symbolic
ANSWER:
b
RATIONALE:
Feedback: The human resources (HR) frame focuses on producing harmony between the
needs of the organization and the needs of people. It recognizes that mismatches can occur
between the needs of the organization and those of individuals and groups, and works to
resolve any potential problems.
POINTS:
1
DIFFICULTY:
Difficulty: Moderate
REFERENCES:
p.52
QUESTION TYPE:
Multiple Choice
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.10 – LO: 2-2
NATIONAL STANDARDS: United States – BUSPROG: Analytic
TOPICS:
Understanding Organizations
KEYWORDS:
Bloom’s: Comprehension
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
4/27/2018 3:48 PM
30. The symbolic perspective of an organization:
a. focuses on different groupsโ roles and responsibilities to meet the goals and policies set by top management.
b. views the organization as coalitions composed of varied individuals and interest groups.
c. focuses on providing harmony between the needs of the organization and the needs of people.
d. focuses on the meanings of the culture, language, traditions, and image of the organization.
ANSWER:
d
RATIONALE:
Feedback: The symbolic frame focuses on symbols and meanings. In this frame, the most
important aspect of any event in an organization is not what actually happened, but what it
Copyright Cengage Learning. Powered by Cognero.
Page 13
Chapter 2 – The Project Management Information Technology Context
means.
POINTS:
1
DIFFICULTY:
Difficulty: Moderate
REFERENCES:
p.53
QUESTION TYPE:
Multiple Choice
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.10 – LO: 2-2
NATIONAL STANDARDS: United States – BUSPROG: Analytic
TOPICS:
Understanding Organizations
KEYWORDS:
Bloom’s: Comprehension
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/8/2018 11:03 AM
31. Which perspective on organizations assumes that organizations are coalitions composed of varied individuals and
interest groups?
a. Political frame
b. Symbolic frame
c. Structural frame
d. Human resources frame
ANSWER:
a
RATIONALE:
Feedback: The political frame addresses organizational and personal politics. Politics in
organizations take the form of competition among groups or individuals for power and
leadership. The political frame assumes that organizations are coalitions composed of varied
individuals and interest groups.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.52
QUESTION TYPE:
Multiple Choice
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.10 – LO: 2-2
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Understanding Organizations
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/8/2018 11:04 AM
32. Greyโs Infotech sells customized hardware and software solutions for businesses. The salespeople for Greyโs have a
strict dress code when meeting clients. They are required to wear dark business suits, in order to convey the companyโs
dedication to quality. The meaning conveyed to the clientsโ through the salespeopleโs clothing is part of the _____ frame
of the organization.
a. political
b. symbolic
c. structural
d. human resources
ANSWER:
b
RATIONALE:
Feedback: The symbolic frame focuses on symbols and meanings. In this frame, the most
important aspect of any event in an organization is not what actually happened, but what it
means. The symbolic frame also relates to the companyโs culture. How do people dress? How
many hours do they work? How do they run meetings?
Copyright Cengage Learning. Powered by Cognero.
Page 14
Chapter 2 – The Project Management Information Technology Context
POINTS:
1
DIFFICULTY:
Difficulty: Moderate
REFERENCES:
p.53
QUESTION TYPE:
Multiple Choice
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.10 – LO: 2-2
NATIONAL STANDARDS: United States – BUSPROG: Analytic
TOPICS:
Understanding Organizations
KEYWORDS:
Bloom’s: Application
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
4/27/2018 3:48 PM
33. In Rizzati Corp, vice presidents in departments such as engineering, manufacturing, IT, and human resources report
directly to the chief executive officer and undertake their tasks independently of each other. The staffs of these
departments have specialized skills in their respective disciplines. Which type of organizational structure does Rizatti
Corp have?
a. Project
b. Symbolic
c. Matrix
d. Functional
ANSWER:
d
RATIONALE:
Feedback: A functional organizational structure is the hierarchy most people think of when
picturing an organizational chart. Functional managers or vice presidents in specialties such
as engineering, manufacturing, IT, and human resources report to the chief executive officer
(CEO).
POINTS:
1
DIFFICULTY:
Difficulty: Moderate
REFERENCES:
p.53-55
QUESTION TYPE:
Multiple Choice
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.10 – LO: 2-2
NATIONAL STANDARDS: United States – BUSPROG: Analysis
TOPICS:
Understanding Organizations
KEYWORDS:
Bloom’s: Application
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/7/2018 10:46 PM
34. In a _____organizational structure, program managers, rather than functional managers or vice presidents, report to
the CEO. Their staffs have a variety of skills needed to complete all required tasks within their programs.
a. project
b. symbolic
c. matrix
d. functional
ANSWER:
a
RATIONALE:
Feedback: A project organizational structure also is hierarchical, but instead of functional
managers or vice presidents reporting to the CEO, program managers report to the CEO.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.54
Copyright Cengage Learning. Powered by Cognero.
Page 15
Chapter 2 – The Project Management Information Technology Context
QUESTION TYPE:
Multiple Choice
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.10 – LO: 2-2
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Understanding Organizations
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
4/27/2018 3:48 PM
35. In a _____ organizational structure, personnel often report to both a functional manager and one or more project
managers.
a. project
b. symbolic
c. matrix
d. functional
ANSWER:
c
RATIONALE:
Feedback: A matrix organizational structure represents the middle ground between functional
and project structures. Personnel often report both to a functional manager and one or more
project managers.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p. 55
QUESTION TYPE:
Multiple Choice
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.10 – LO: 2-2
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Understanding Organizations
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
4/27/2018 3:48 PM
36. In what type of organizational structure do project managers have the most authority?
a. Functional
b. Project
c. Matrix
d. Circular
ANSWER:
b
RATIONALE:
Feedback: Project managers have the most authority in a pure project organizational structure
and the least amount of authority in a pure functional organizational structure.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.55
QUESTION TYPE:
Multiple Choice
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.10 – LO: 2-2
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Understanding Organizations
KEYWORDS:
Bloom’s: Knowledge
Copyright Cengage Learning. Powered by Cognero.
Page 16
Chapter 2 – The Project Management Information Technology Context
DATE CREATED:
DATE MODIFIED:
4/27/2018 3:48 PM
5/7/2018 10:52 PM
37. In what type of organizational structure do project managers have the least amount of authority?
a. Functional
b. Project
c. Matrix
d. Circular
ANSWER:
a
RATIONALE:
Feedback: Project managers have the most authority in a pure project organizational structure
and the least amount of authority in a pure functional organizational structure.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
P.55
QUESTION TYPE:
Multiple Choice
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.10 – LO: 2-2
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Understanding Organizations
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/7/2018 10:54 PM
38. Which of the following is true of a matrix organizational structure?
a. In a matrix organizational structure, employees are organized into departments according to their skills, and
there is little interaction between employees from different departments.
b. Project managers in matrix organizations have staff from only a single functional area working on their
projects.
c. In a strong matrix organizational structure, the project manager controls the project budget and has moderate
to high authority.
d. A matrix organizational structure is hierarchical, but instead of functional managers reporting to the CEO,
program managers report to the CEO.
ANSWER:
c
RATIONALE:
Feedback: In a strong matrix organizational structure, the project manager controls the
project budget and has moderate to high authority.
POINTS:
1
DIFFICULTY:
Difficulty: Moderate
REFERENCES:
p.56
QUESTION TYPE:
Multiple Choice
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.10 – LO: 2-2
NATIONAL STANDARDS: United States – BUSPROG: Analytic
TOPICS:
Understanding Organizations
KEYWORDS:
Bloom’s: Comprehension
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/8/2018 11:05 AM
Copyright Cengage Learning. Powered by Cognero.
Page 17
Chapter 2 – The Project Management Information Technology Context
39. _____ refers to a set of shared assumptions, values, and behaviors that characterize the functioning of an organization.
a. Chain of command
b. Line of control
c. Organizational culture
d. Organizational structure
ANSWER:
c
RATIONALE:
Feedback: Organizational culture is a set of shared assumptions, values, and behaviors that
characterize the functioning of an organization. It often includes elements of the four frames.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.51
QUESTION TYPE:
Multiple Choice
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.10 – LO: 2-2
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Understanding Organizations
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
4/27/2018 3:48 PM
40. Which characteristic of organizational culture describes the degree to which managementโs decisions take into account
the effect of outcomes on people within the organization?
a. Member identity
b. Group emphasis
c. People focus
d. Unit integration
ANSWER:
c
RATIONALE:
Feedback: The people focus characteristic of organizational culture describes the degree to
which managementโs decisions take into account the effect of outcomes on people within the
organization. Good project managers often balance the needs of individuals and the
organization.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.57
QUESTION TYPE:
Multiple Choice
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.10 – LO: 2-2
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Understanding Organizations
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/7/2018 10:59 PM
41. Which characteristic of organizational culture refers to the degree to which employees identify with the organization
as a whole, rather than with their types of job or profession?
a. Member identity
b. People focus
c. Group emphasis
d. Unit integration
ANSWER:
a
RATIONALE:
Feedback: Member identity refers to the degree to employees identify with the organization
Copyright Cengage Learning. Powered by Cognero.
Page 18
Chapter 2 – The Project Management Information Technology Context
as a whole, rather than with their types of job or profession.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.57
QUESTION TYPE:
Multiple Choice
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.10 – LO: 2-2
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Understanding Organizations
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/7/2018 11:02 PM
42. Which characteristic of organizational culture refers to the degree to which departments within an organization are
encouraged to coordinate with each other?
a. Member identity
b. People focus
c. Group emphasis
d. Unit integration
ANSWER:
d
RATIONALE:
Feedback: Unit integration refers to the degree to which units or departments within an
organization are encouraged to coordinate with each other.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.57
QUESTION TYPE:
Multiple Choice
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.10 – LO: 2-2
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Understanding Organizations
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/8/2018 11:06 AM
43. In organizational culture, what does people focus refer to?
a. The degree to which the organization monitors and responds to changes in the external environment
b. The degree to which rules, policies, and direct supervision are used to oversee and control employee behavior
c. The degree to which managementโs decisions take into account the effect of outcomes on employees within
the organization
d. The degree to which employees are encouraged to be aggressive, innovative, and risk seeking
ANSWER:
c
RATIONALE:
Feedback: People focus refers to the degree to which managementโs decisions take into
account the effect of outcomes on people within the organization.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.57
Copyright Cengage Learning. Powered by Cognero.
Page 19
Chapter 2 – The Project Management Information Technology Context
QUESTION TYPE:
Multiple Choice
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.10 – LO: 2-2
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Understanding Organizations
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/14/2018 10:06 AM
44. In organizational culture, what does means-end orientation refer to?
a. The degree to which the organization monitors and responds to changes in the external environment
b. The degree to which rules, policies, and direct supervision are used to oversee and control employee behavior
c. The degree to which management focuses on outcomes rather than on techniques and processes used to
achieve results
d. The degree to which employees are encouraged to be aggressive, innovative, and risk seeking
ANSWER:
c
RATIONALE:
Feedback: Means-ends orientation refers to the degree to which management focuses on
outcomes rather than on techniques and processes used to achieve results.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.58
QUESTION TYPE:
Multiple Choice
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.10 – LO: 2-2
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Understanding Organizations
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/7/2018 11:08 PM
45. Which characteristic of organizational culture refers to the degree to which the organization monitors and responds to
changes in the external environment?
a. Means-ends orientation
b. Open-systems focus
c. Conflict tolerance
d. Risk tolerance
ANSWER:
b
RATIONALE:
Feedback: Open-systems focus refers to the degree to which the organization monitors and
responds to changes in the external environment
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.58
QUESTION TYPE:
Multiple Choice
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.10 – LO: 2-2
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
Copyright Cengage Learning. Powered by Cognero.
Page 20
Chapter 2 – The Project Management Information Technology Context
TOPICS:
KEYWORDS:
DATE CREATED:
DATE MODIFIED:
Understanding Organizations
Bloom’s: Knowledge
4/27/2018 3:48 PM
5/7/2018 11:10 PM
46. In organizational culture, what does control refer to?
a. The degree to which the organization monitors and responds to changes in the external environment
b. The degree to which rules, policies, and direct supervision are used to oversee employee behavior
c. The degree to which management focuses on outcomes rather than on techniques and processes used to
achieve results
d. The degree to which employees are encouraged to be aggressive, innovative, and risk seeking
ANSWER:
b
RATIONALE:
Feedback: Control refers to the degree to which rules, policies, and direct supervision are
used to oversee and control employee behavior.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.58
QUESTION TYPE:
Multiple Choice
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.10 – LO: 2-2
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Understanding Organizations
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/7/2018 11:11 PM
47. Select an example of external stakeholders for an organization.
a. Top managers
b. Functional managers
c. Employees
d. Competitors
ANSWER:
d
RATIONALE:
Feedback: External project stakeholders include the projectโs customers (if they are external
to the organization), competitors, suppliers, and other external groups potentially involved in
the project or affected by it, such as government officials or concerned citizens.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.58
QUESTION TYPE:
Multiple Choice
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.11 – LO: 2-3
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Focusing on Stakeholder Needs
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/7/2018 11:13 PM
Copyright Cengage Learning. Powered by Cognero.
Page 21
Chapter 2 – The Project Management Information Technology Context
48. Which term refers to a product or service, such as a technical report, a training session, a piece of hardware, or a
segment of software code, produced or provided as part of a project?
a. Deliverable
b. Input
c. System
d. Resource
ANSWER:
a
RATIONALE:
Feedback: A deliverable is a product or service, such as a technical report, a training session,
a piece of hardware, or a segment of software code, produced or provided as part of a project.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.63
QUESTION TYPE:
Multiple Choice
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.12 – LO: 2-4
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Project Phases and the Project Life Cycle
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/8/2018 11:08 AM
49. Which of the following is true of the project life cycle?
a. In the early phases of a project life cycle, resource needs are usually lowest.
b. In the later phases of the project life cycle, the level of uncertainty is usually the highest.
c. It is much more expensive to make major changes to a project during the earlier phases than the latter phases.
d. More resources are usually needed during the initial phases of a project than during the middle or final phases.
ANSWER:
a
RATIONALE:
Feedback: In the early phases of a project life cycle, resource needs are usually lowest and
the level of uncertainty is highest.
POINTS:
1
DIFFICULTY:
Difficulty: Moderate
REFERENCES:
p.63
QUESTION TYPE:
Multiple Choice
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.12 – LO: 2-4
NATIONAL STANDARDS: United States – BUSPROG: Analytic
TOPICS:
Project Phases and the Project Life Cycle
KEYWORDS:
Bloom’s: Comprehension
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/8/2018 11:08 AM
50. In which product life cycle the scope, schedule, and cost are determined early, and changes to scope are carefully
managed?
a. Iterative
b. Incremental
c. Predictive
d. Adaptive
ANSWER:
c
Copyright Cengage Learning. Powered by Cognero.
Page 22
Chapter 2 – The Project Management Information Technology Context
Feedback: In the predictive life cycle the scope, schedule, and cost are determined early, and
changes to scope are carefully managed. PMI also refers to predictive life cycles as waterfall.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.64
QUESTION TYPE:
Multiple Choice
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.12 – LO: 2-4
NATIONAL STANDARDS: United States – BUSPROG: Analytic – Analytic
TOPICS:
Project Phases and the Project Life Cycle
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/7/2018 11:26 PM
RATIONALE:
51. In which development life cycle do stakeholders define and approve the detailed scope before the start on an iteration?
a. Adaptive
b. Hybrid
c. Incremental
d. Iterative
ANSWER:
a
RATIONALE:
Feedback: In an adaptive life cycle: stakeholders define and approve the detailed scope
before the start of an iteration, producing a useable product at the end of each iteration.
POINTS:
1
DIFFICULTY:
Difficulty: Moderate
REFERENCES:
p.64
QUESTION TYPE:
Multiple Choice
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.12 – LO: 2-4
NATIONAL STANDARDS: United States – BUSPROG: Analytic
TOPICS:
Project Phases and the Project Life Cycle
KEYWORDS:
Bloom’s: Comprehension
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/8/2018 11:10 AM
52. Which approach to product development is currently used by many organizations so a predictive set of steps is used as
an overall means to coordinate more detailed steps that are adaptively managed?
a. Adaptive
b. Hybrid
c. Predictive
d. Incremental
ANSWER:
b
RATIONALE:
Feedback: Many organizations today use a hybrid approach to product development where a
predictive set of steps is used as an overall means to coordinate more detailed steps that are
adaptively managed. Predictive and adaptive approaches are not a mutually exclusive choice.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.64
QUESTION TYPE:
Multiple Choice
Copyright Cengage Learning. Powered by Cognero.
Page 23
Chapter 2 – The Project Management Information Technology Context
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.12 – LO: 2-4
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Project Phases and the Project Life Cycle
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/7/2018 11:34 PM
53. Which systems development life cycle model assumes that requirements will remain stable after they are defined?
a. Spiral life cycle
b. Waterfall life cycle
c. Prototyping life cycle
d. RAD life cycle
ANSWER:
b
RATIONALE:
Feedback: The waterfall life cycle model has well-defined, linear stages of systems analysis,
design, construction, testing, and support. This life cycle model assumes that requirements
will remain stable after they are defined.
POINTS:
1
DIFFICULTY:
Difficulty: Moderate
REFERENCES:
p.64
QUESTION TYPE:
Multiple Choice
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.12 – LO: 2-4
NATIONAL STANDARDS: United States – BUSPROG: Analytic
TOPICS:
Project Phases and the Project Life Cycle
KEYWORDS:
Bloom’s: Comprehension
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/7/2018 11:38 PM
54. In which systems development life cycle do model developers use a model to generate functional requirements and
physical design specifications simultaneously?
a. RAD life cycle
b. Prototyping life cycle
c. Spiral life cycle
d. Waterfall life cycle
ANSWER:
b
RATIONALE:
Feedback: The prototyping life cycle model is used for developing software prototypes to
clarify user requirements for operational software. It requires heavy user involvement, and
developers use a model to generate functional requirements and physical design
specifications simultaneously. This approach is often used in systems that involve a great
deal of user interface design, such as website projects.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.65
QUESTION TYPE:
Multiple Choice
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.12 – LO: 2-4
NATIONAL STANDARDS: United States – BUSPROG: o Reflective Thinking – BUSPROG: Analytic skills: Statistics
and Management Science
Copyright Cengage Learning. Powered by Cognero.
Page 24
Chapter 2 – The Project Management Information Technology Context
TOPICS:
KEYWORDS:
DATE CREATED:
DATE MODIFIED:
Project Phases and the Project Life Cycle
Bloom’s: Knowledge
4/27/2018 3:48 PM
5/8/2018 11:11 AM
55. The _____ model uses an approach in which developers work with an evolving prototype, using tools such as
computer-aided software engineering, joint requirements planning, and joint application design to facilitate rapid
prototyping and code generation.
a. prototyping life cycle
b. waterfall life cycle
c. RAD life cycle
d. spiral life cycle
ANSWER:
c
RATIONALE:
Feedback: The RAD life cycle model uses an approach in which developers work with an
evolving prototype. This life cycle model also requires heavy user involvement and helps
produce systems quickly without sacrificing quality.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.65
QUESTION TYPE:
Multiple Choice
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.12 – LO: 2-4
NATIONAL STANDARDS: United States – BUSPROG: o Reflective Thinking – BUSPROG: Analytic skills: Statistics
and Management Science
TOPICS:
Project Phases and the Project Life Cycle
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/7/2018 11:41 PM
56. Which of the following best describes a kill point in the project life cycle?
a. The period of time given to managers during the feasibility phases to decide on the cost, quality, and time
constraints for the project
b. A review of the status of a project at each phase of development to determine if it should be continued,
redirected, or terminated
c. The point of time in the project lifecycle after which it is impossible to terminate a running project
d. The final submission of the project deliverables after which the project is terminated
ANSWER:
b
RATIONALE:
Feedback: A management review should occur after each phase to evaluate progress,
potential success, and continued compatibility with organizational goals. These management
reviews, called phase exits, phase gate reviews, or kill points, are very important for keeping
projects on track and determining if they should be continued, redirected, or terminated.
POINTS:
1
DIFFICULTY:
Difficulty: Moderate
REFERENCES:
p.66
QUESTION TYPE:
Multiple Choice
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.12 – LO: 2-4
Copyright Cengage Learning. Powered by Cognero.
Page 25
Chapter 2 – The Project Management Information Technology Context
NATIONAL STANDARDS:
TOPICS:
KEYWORDS:
DATE CREATED:
DATE MODIFIED:
United States – BUSPROG: Analytic
Project Phases and the Project Life Cycle
Bloom’s: Comprehension
4/27/2018 3:48 PM
5/7/2018 11:44 PM
57. Which statement best describes outsourcing?
a. An organization selling its products in a market outside its domestic market
b. An organizationโs acquisition of goods and services from an outside source
c. An organization setting up manufacturing and retailing facilities in a new country
d. An organizationโs use of virtual teams with employees located in different countries
ANSWER:
b
RATIONALE:
Feedback: Outsourcing is an organizationโs acquisition of goods and services from an outside
source. The term offshoring is sometimes used to describe outsourcing from another country.
POINTS:
1
DIFFICULTY:
Difficulty: Moderate
REFERENCES:
p.70
QUESTION TYPE:
Multiple Choice
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.14 – LO: 2-6
NATIONAL STANDARDS: United States – BUSPROG: o Reflective Thinking – BUSPROG: Analytic skills: Statistics
and Management Science
TOPICS:
Recent Trends Affecting Information Technology Project Management
KEYWORDS:
Bloom’s: Comprehension
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/14/2018 10:13 AM
58. Which is a disadvantage for virtual teams compared to traditional teams?
a. Increased costs for office space and support
b. Reduced opportunities for informal transfer of information
c. Limited flexibility in team working hours
d. Reduced dependence on technology and processes for accomplishing work
ANSWER:
b
RATIONALE:
Feedback: Virtual teams reduce the ability of team members to network and transfer
information informally.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.72
QUESTION TYPE:
Multiple Choice
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.14 – LO: 2-6
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Recent Trends Affecting Information Technology Project Management
KEYWORDS:
Bloom’s: Knowledge
Copyright Cengage Learning. Powered by Cognero.
Page 26
Chapter 2 – The Project Management Information Technology Context
DATE CREATED:
DATE MODIFIED:
4/27/2018 3:48 PM
5/14/2018 10:14 AM
59. Which characteristic is true of virtual teams?
a. It is easier for a virtual team to build relationships and trust.
b. Negative incentives do not impact virtual team members.
c. It is important to select team members carefully.
d. As they never meet, virtual teams do not have conflicts.
ANSWER:
c
RATIONALE:
Feedback: It is important to select team members carefully and to form a team in which all
roles are covered. All virtual team members must also understand their roles on the team.
POINTS:
1
DIFFICULTY:
Difficulty: Moderate
REFERENCES:
p. 72
QUESTION TYPE:
Multiple Choice
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.14 – LO: 2-6
NATIONAL STANDARDS: United States – BUSPROG: Analytic
TOPICS:
Recent Trends Affecting Information Technology Project Management
KEYWORDS:
Bloom’s: Comprehension
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
7/25/2018 5:18 PM
60. Which observation is true of the agile approach to software development?
a. In the agile method, requirements and solutions evolve through collaboration.
b. An agile approach sets scope goals, but leaves time and cost goals flexible.
c. Agile is a predictive model of software development.
d. In the agile approach, requirements must be clearly expressed early in the life cycle.
ANSWER:
a
RATIONALE:
Feedback: Agile today means using an approach where requirements and solutions evolve
through collaboration.
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p. 73
QUESTION TYPE:
Multiple Choice
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.14 – LO: 2-6
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Recent Trends Affecting Information Technology Project Management
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/8/2018 11:14 AM
Completion
Copyright Cengage Learning. Powered by Cognero.
Page 27
Chapter 2 – The Project Management Information Technology Context
61. A(n) _____ is an overall model for thinking about things as systems.
ANSWER:
systems philosophy
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.49
QUESTION TYPE:
Completion
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.9 – LO: 2-1
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
A Systems View of Project Management
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/7/2018 11:52 PM
62. _____ are sets of interacting components working within an environment to fulfill some purpose.
ANSWER:
Systems
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.49
QUESTION TYPE:
Completion
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.9 – LO: 2-1
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
A Systems View of Project Management
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
4/27/2018 3:48 PM
63. _____ addresses the business, technological, and organizational issues associated with creating, maintaining, and
modifying a system.
ANSWER:
Systems management
POINTS:
1
DIFFICULTY:
Difficulty: Moderate
REFERENCES:
p.49
QUESTION TYPE:
Completion
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.9 – LO: 2-1
NATIONAL STANDARDS: United States – BUSPROG: Analytic
TOPICS:
A Systems View of Project Management
KEYWORDS:
Bloom’s: Comprehension
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/8/2018 11:15 AM
64. The three spheres of systems management are business, organization, and _____.
Copyright Cengage Learning. Powered by Cognero.
Page 28
Chapter 2 – The Project Management Information Technology Context
ANSWER:
technology
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.50
QUESTION TYPE:
Completion
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.9 – LO: 2-1
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
A Systems View of Project Management
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
4/27/2018 3:48 PM
65. The _____ frame of the organization is the one that is usually depicted in an organizational chart.
ANSWER:
structural
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.52
QUESTION TYPE:
Completion
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.10 – LO: 2-2
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Understanding Organizations
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
4/27/2018 3:48 PM
66. The _____ frame of an organization relates to the companyโs culture.
ANSWER:
symbolic
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.53
QUESTION TYPE:
Completion
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.10 – LO: 2-2
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Understanding Organizations
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
4/27/2018 3:48 PM
67. Three general classifications of organizational structures are _____, project, and matrix.
ANSWER:
functional
POINTS:
1
Copyright Cengage Learning. Powered by Cognero.
Page 29
Chapter 2 – The Project Management Information Technology Context
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p. 53
QUESTION TYPE:
Completion
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.10 – LO: 2-2
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Understanding Organizations
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
4/27/2018 3:48 PM
68. In a(n) _____ organizational structure, project managers have little or no authority.
ANSWER:
functional
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.56
QUESTION TYPE:
Completion
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.10 – LO: 2-2
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Understanding Organizations
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
4/27/2018 3:48 PM
69. _____ refers to the degree to which work activities are organized around teams, rather than individuals.
ANSWER:
Group emphasis
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.57
QUESTION TYPE:
Completion
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.10 – LO: 2-2
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Understanding Organizations
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
4/27/2018 3:48 PM
70. _____ refers to the degree to which rules, policies, and direct supervision are used to oversee employee behavior.
ANSWER:
Control
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.58
Copyright Cengage Learning. Powered by Cognero.
Page 30
Chapter 2 – The Project Management Information Technology Context
QUESTION TYPE:
Completion
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.10 – LO: 2-2
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Understanding Organizations
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
4/27/2018 3:48 PM
71. Some projects have a senior manager called a(n) _____ who acts as a key advocate for a project.
ANSWER:
champion
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.60
QUESTION TYPE:
Completion
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.11 – LO: 2-3
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Focusing on Stakeholder Needs
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/8/2018 11:09 AM
72. A major element of good practice concerns _____, which addresses the authority and control for key IT activities in
organizations, including IT infrastructure, IT use, and project management.
ANSWER:
IT governance
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.61
QUESTION TYPE:
Completion
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.11 – LO: 2-3
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Focusing on Stakeholder Needs
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/8/2018 11:16 AM
73. A(n) _____ refers to a product or service, such as a report, a training session, a piece of hardware, or a segment of
software code, produced or provided as part of a project.
ANSWER:
deliverable
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.63
Copyright Cengage Learning. Powered by Cognero.
Page 31
Chapter 2 – The Project Management Information Technology Context
QUESTION TYPE:
Completion
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.12 – LO: 2-4
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Project Phases and the Project Life Cycle
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
4/27/2018 3:48 PM
74. A(n) _____ is a framework for describing the phases of developing information systems.
ANSWER:
SDLC
systems development life cycle
systems development life cycle (SDLC)
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.64
QUESTION TYPE:
Completion
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.12 – LO: 2-4
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Project Phases and the Project Life Cycle
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/8/2018 12:03 AM
75. The _____ life cycle model is suitable for projects in which changes can be incorporated with reasonable cost
increases or acceptable time delays.
ANSWER:
spiral
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.65
QUESTION TYPE:
Completion
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.12 – LO: 2-4
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Project Phases and the Project Life Cycle
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
4/27/2018 3:48 PM
76. The _____ life cycle model is used when risk must be tightly controlled and when changes must be restricted after the
requirements are defined.
ANSWER:
waterfall
POINTS:
1
DIFFICULTY:
Difficulty: Easy
Copyright Cengage Learning. Powered by Cognero.
Page 32
Chapter 2 – The Project Management Information Technology Context
REFERENCES:
p.64
QUESTION TYPE:
Completion
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.12 – LO: 2-4
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Project Phases and the Project Life Cycle
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/8/2018 12:07 AM
77. _____ software development can be used for software development or in any environment in which the requirements
are unknown or change quickly.
ANSWER:
Agile
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p. 73
QUESTION TYPE:
Completion
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.12 – LO: 2-4
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Project Phases and the Project Life Cycle
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/14/2018 10:17 AM
78. _____ is an organizationโs acquisition of goods and services from an outside source.
ANSWER:
Outsourcing
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.70
QUESTION TYPE:
Completion
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.14 – LO: 2-6
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Recent Trends Affecting Information Technology Project Management
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
4/27/2018 3:48 PM
79. Sprint planning is part of the basic ______.
ANSWER:
Scrum framework
POINTS:
1
DIFFICULTY:
Difficulty: Easy
REFERENCES:
p.74
Copyright Cengage Learning. Powered by Cognero.
Page 33
Chapter 2 – The Project Management Information Technology Context
QUESTION TYPE:
Completion
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.14 – LO: 2-6
NATIONAL STANDARDS: United States – BUSPROG: – Comprehension
TOPICS:
Recent Trends Affecting Information Technology Project Management
KEYWORDS:
Bloom’s: Knowledge
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
4/27/2018 3:48 PM
Essay
80. Describe the concept of a systems approach.
ANSWER:
The term systems approach emerged in the 1950s to describe a holistic and analytical
approach to solving complex problems that includes using a systems philosophy, systems
analysis, and systems management. A systems philosophy is an overall model for thinking
about things as systems.
Systems are sets of interacting components working within an environment to fulfill some
purpose. For example, the human body is a system composed of many subsystems, including
the nervous system, the skeletal system, the circulatory system, and the digestive system.
Systems analysis is a problem-solving approach that requires defining the scope of the
system, dividing it into its components, and then identifying and evaluating its problems,
opportunities, constraints, and needs. Once this is completed, the systems analyst then
examines alternative solutions for improving the current situation, identifies an optimum, or
at least satisfactory, solution or action plan; and examines that plan against the entire system.
Systems management addresses the business, technological, and organizational issues
associated with creating, maintaining, and modifying a system.
POINTS:
1
DIFFICULTY:
Difficulty: Moderate
REFERENCES:
p.49
QUESTION TYPE:
Essay
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.9 – LO: 2-1
NATIONAL STANDARDS: United States – BUSPROG: Analytic
TOPICS:
A Systems View of Project Management
KEYWORDS:
Bloom’s: Comprehension
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/14/2018 10:18 AM
81. What are the four frames of organizations? Describe each frame.
ANSWER:
The structural frame deals with how the organization is structured (usually depicted in an
organizational chart) and focuses on different groupsโ roles and responsibilities in order to
meet the goals and policies set by top management. This frame is very rational and focuses
on coordination and control. For example, within the structural frame, a key IT issue is
whether a company should centralize the IT personnel in one department or decentralize
across several departments.
The human resources (HR) frame focuses on producing harmony between the needs of the
Copyright Cengage Learning. Powered by Cognero.
Page 34
Chapter 2 – The Project Management Information Technology Context
organization and the needs of the people. It recognizes that mismatches can occur between
the needs of the organization and those of individuals and groups, and works to resolve any
potential problems. For example, many projects might be more efficient for the organization
if personnel worked 80 or more hours a week for several months. However, this work
schedule would conflict with the personal lives and health of many employees. Important IT
issues related to the human resources frame are the shortage of skilled IT workers within the
organization and unrealistic schedules imposed on many projects.
The political frame addresses organizational and personal politics. Politics in organizations
take the form of competition among groups or individuals for power and leadership. The
political frame emphasizes that organizations are coalitions composed of varied individuals
and interest groups. Often, important decisions need to be made based on the allocation of
scarce resources. Competition for resources makes conflict a central issue in organizations,
and power improves the ability to obtain those resources. Project managers must pay
attention to politics and power if they are to be effective. It is important to know who opposes
your projects as well as who supports them. Important IT issues related to the political frame
are the differences in power between central functions to operating units or between
functional managers to project managers.
The symbolic frame focuses on symbols and meanings. In this frame, the most important
aspect of any event in an organization is not what actually happened, but what it means. Was
it a good sign that the CEO came to a kick-off meeting for a project, or was it a threat? The
symbolic frame also relates to the companyโs culture. How do people dress? How many
hours do they work? How do they run meetings? Many IT projects are international and
include stakeholders from various cultures. Understanding those cultures is also a crucial part
of the symbolic frame.
POINTS:
1
DIFFICULTY:
Difficulty: Moderate
REFERENCES:
p.52-53
QUESTION TYPE:
Essay
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.10 – LO: 2-2
NATIONAL STANDARDS: United States – BUSPROG: Analytic
TOPICS:
Understanding Organizations
KEYWORDS:
Bloom’s: Comprehension
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
7/25/2018 5:19 PM
82. Describe each of the three major types of organizational structure.
ANSWER:
A functional organizational structure is the hierarchy most people think of when picturing
an organizational chart. Functional managers or vice presidents in specialties such as
engineering, manufacturing, IT, and human resources (HR) report to the chief executive
officer (CEO). Their staffs have specialized skills in their respective disciplines. For
example, most colleges and universities have very strong functional organizations. Only
faculty in the business department teach business courses; faculty in the history department
teach history; faculty in the art department teach art, and so on.
A project organizational structure also is hierarchical, but instead of functional managers
or vice presidents reporting to the CEO, program managers report to the CEO. Their staffs
have a variety of skills needed to complete the projects within their programs. An
organization that uses this structure earns their revenue primarily from performing projects
Copyright Cengage Learning. Powered by Cognero.
Page 35
Chapter 2 – The Project Management Information Technology Context
for other groups under contract. For example, many defense, architectural, engineering, and
consulting companies use a project organizational structure. These companies often hire
people specifically to work on particular projects.
A matrix organizational structure represents the middle ground between functional and
project structures. Personnel often report to both a functional manager and one or more
project managers. For example, IT personnel at many companies often split their time
between two or more projects, but they report to their manager in the IT department. Project
managers in matrix organizations have staff from various functional areas working on their
projects. Matrix organizational structures can be strong, weak, or balanced, based on the
amount of control exerted by the project managers.
POINTS:
1
DIFFICULTY:
Difficulty: Moderate
REFERENCES:
p.53-55
QUESTION TYPE:
Essay
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.11 – LO: 2-3
NATIONAL STANDARDS: United States – BUSPROG: Analytic
TOPICS:
Understanding Organizations
KEYWORDS:
Bloom’s: Comprehension
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/8/2018 12:25 AM
83. Why is top management commitment crucial for project managers?
ANSWER:
Project managers need adequate resources. The best way to kill a project is to withhold the
required money, human resources, and visibility for the project. If project managers have top
management commitment, they will also have adequate resources and not be distracted by
events that do not affect their specific projects.
Project managers often require approval for unique project needs in a timely manner. For
example, on large IT projects, top management must understand that unexpected problems
may result from the nature of the products being developed and the specific skills of the
people on the project team. The team might need additional hardware and software halfway
through the project for proper testing, or the project manager might need to offer special pay
and benefits to attract and retain key project personnel. With top management commitment,
project managers can meet these needs.
Project managers must have cooperation from people in other parts of the organization.
Because most IT projects cut across functional areas, top management must help project
managers deal with the political issues that often arise. If certain functional managers are not
responding to project managersโ requests for necessary information, top management must
step in to encourage functional managers to cooperate.
POINTS:
DIFFICULTY:
Project managers often need someone to mentor and coach them on leadership issues. Many
IT project managers come from technical positions and are inexperienced as managers.
Senior managers should take the time to pass on advice on how to be good leaders. They
should encourage new project managers to take classes to develop leadership skills and
allocate the time and funds for managers to do so.
1
Difficulty: Moderate
Copyright Cengage Learning. Powered by Cognero.
Page 36
Chapter 2 – The Project Management Information Technology Context
REFERENCES:
p. 60-61
QUESTION TYPE:
Essay
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.11 – LO: 2-3
NATIONAL STANDARDS: United States – BUSPROG: Analytic
TOPICS:
Focusing on Stakeholder Needs
KEYWORDS:
Bloom’s: Comprehension
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/8/2018 12:29 AM
84. What is a systems development life cycle? What are some of the predictive models associated with the systems
development life cycle?
ANSWER:
A systems development life cycle (SDLC) is a framework for describing the phases of
developing information systems. In addition to the waterfall model for the SDLC, other
predictive life cycles include the spiral model, the prototyping model, and the Rapid
Application Development (RAD) model. The project team spends a large portion of the
project attempting to clarify the requirements of the entire system and then producing a
design. Users are often unable to see any tangible results in terms of working software for an
extended period. Below are brief descriptions of several predictive SDLC models:
The waterfall life cycle model has well-defined, linear stages of systems development and
support. This life cycle model assumes that requirements will remain stable after they are
defined.
The spiral life cycle model was developed based on refinements of the waterfall model as
applied to large government software projects. It recognizes the fact that most software is
developed using an iterative or spiral approach rather than a linear approach.
The prototyping life cycle model is used for developing software prototypes to clarify user
requirements for operational software. It requires heavy user involvement, and developers
use a model to generate functional requirements and physical design specifications
simultaneously. Developers can throw away or keep prototypes, depending on the project.
The RAD life cycle model uses an approach in which developers work with an evolving
prototype. This life cycle model also requires heavy user involvement and helps produce
systems quickly without sacrificing quality. Developers use RAD tools such as CASE
(computer-aided software engineering), JRP (joint requirements planning), and JAD (joint
application design) to facilitate rapid prototyping and code generation.
POINTS:
1
DIFFICULTY:
Difficulty: Moderate
REFERENCES:
p. 64-65
QUESTION TYPE:
Essay
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.12 – LO: 2-4
NATIONAL STANDARDS: United States – BUSPROG: Analytic
TOPICS:
Project Phases and the Project Life Cycle
KEYWORDS:
Bloom’s: Comprehension
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
5/8/2018 12:34 AM
Copyright Cengage Learning. Powered by Cognero.
Page 37
Chapter 2 – The Project Management Information Technology Context
85. Discuss four key issues project managers must address when working on global projects.
ANSWER:
Communications. Because people work in different time zones, speak different languages,
have different cultural backgrounds, and celebrate different holidays, it is important to
address how people will communicate in an efficient and timely manner.
Trust. Trust is an important issue for all teams, especially when they are global teams. It is
important to start building trust immediately by recognizing and respecting others’
differences and the value they add to the project.
Common work practices. It is important to align work processes and develop a modus
operandi with which everyone agrees and is comfortable.
Tools. IT pays a vital role in globalization, especially in enhancing communications and work
practices. Many people use free tools such as Skype, Google Docs or social media to
communicate. Many project management software tools include their own communications
and collaboration features in an integrated package.
POINTS:
1
DIFFICULTY:
Difficulty: Moderate
REFERENCES:
p. 69-70
QUESTION TYPE:
Essay
HAS VARIABLES:
False
LEARNING OBJECTIVES: INFO.SCHW.14.14 – LO: 2-6
NATIONAL STANDARDS: United States – BUSPROG: Analytic
TOPICS:
Recent Trends Affecting Information Technology Project Management
KEYWORDS:
Bloom’s: Comprehension
DATE CREATED:
4/27/2018 3:48 PM
DATE MODIFIED:
4/27/2018 3:48 PM
Copyright Cengage Learning. Powered by Cognero.
Page 38
Document Preview (38 of 458 Pages)
User generated content is uploaded by users for the purposes of learning and should be used following SchloarOn's honor code & terms of service.
You are viewing preview pages of the document. Purchase to get full access instantly.
-37%
Test Bank For Information Technology Project Management, 9th Edition
$18.99 $29.99Save:$11.00(37%)
24/7 Live Chat
Instant Download
100% Confidential
Store
Amelia Rodriguez
0 (0 Reviews)
Best Selling
The World Of Customer Service, 3rd Edition Test Bank
$18.99 $29.99Save:$11.00(37%)
Chemistry: Principles And Reactions, 7th Edition Test Bank
$18.99 $29.99Save:$11.00(37%)
Test Bank for Hospitality Facilities Management and Design, 4th Edition
$18.99 $29.99Save:$11.00(37%)
Solution Manual for Designing the User Interface: Strategies for Effective Human-Computer Interaction, 6th Edition
$18.99 $29.99Save:$11.00(37%)
Data Structures and Other Objects Using C++ 4th Edition Solution Manual
$18.99 $29.99Save:$11.00(37%)
2023-2024 ATI Pediatrics Proctored Exam with Answers (139 Solved Questions)
$18.99 $29.99Save:$11.00(37%)