Solution Manual For Refrigeration and Air Conditioning Technology, 8th Edition
Preview Extract
Answer Key
to Accompany
Lab Exercises for
Refrigeration and Air
Conditioning
Technology
_____________________________________________________________________________
Australia โข Brazil โข Mexico โข Singapore โข United Kingdom โข United States
Contents
Chapter 1
Temperature Conversions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
The British Thermal Unit . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 1
Heat Transfer by Conduction . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Chapter 2
Specific Gravity . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Gas Laws . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Work, Power, and Heat Energy . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Chapter 3
Refrigeration System Components and Their Functions . . . . . . 5
Refrigerant Familiarization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Refrigerant Pressure/ Temperature Relationships . . . . . . . . . . . 6
Chapter 4
Safety in the Laboratory . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Chapter 5
Gauge Installation and Removal on Systems Equipped with
Service Valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
Hand Tool Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 8
HVAC Tool Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 9
Megohmmeter Usage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
Gauge Installation and Removal on Systems Equipped with
Service Valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10
Using the Halide Leak Detector . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
Using Electronic Leak Detectors . . . . . . . . . . . . . . . . . . . . . . . . . . . . 11
Chapter 6
Fastener Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 12
Machine and Set Screw Identification . . . . . . . . . . . . . . . . . . . . . . . 12
Chapter 7
Changing a Four-Way Reversing Valve on a Heat Pump . . . . . 13
Changing a Hermetic Compressor . . . . . . . . . . . . . . . . . . . . . . . . . . 13
ยฉ 2019 Cengage Learning. All Rights Reserved. May not be scanned, copied,
or duplicated, or posted to a publicly accessible website, in whole or in part.
Changing an Evaporator in an Air-Conditioning System . . . . . 13
Flaring Tubing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 13
Soldering and Brazing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
Joining PVC Pipe Sections . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
Bending Copper Tubing . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 14
Chapter 8
Gauge Installation and Removal on Systems Equipped with
Service Valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
Hermetic Compressor Changeout . . . . . . . . . . . . . . . . . . . . . . . . . . . 15
Changing a Four-Way Reversing Valve on a Heat Pump . . . . . 15
Gauge Installation and Removal on Systems Equipped with
Service Valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 16
Changing a Hermetic Compressor . . . . . . . . . . . . . . . . . . . . . . . . . . 16
Changing an Evaporator in an Air-Conditioning System . . . . . 16
Charging a Freezer Using a Measured Charge . . . . . . . . . . . . . . . 16
Removing the Moisture from a Refrigerator After an
Evaporator Leak . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 17
Changing a Compressor on a Sealed Refrigeration System . . . 17
Charging a Unit Using Scales or a Charging Cylinder . . . . . . . . . 17
Standing Pressure Test . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
Performing a Deep Vacuum . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
Triple Evacuation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 18
Chapter 9
Hermetic Compressor Changeout . . . . . . . . . . . . . . . . . . . . . . . . . . . 19
Changing a Four-Way Reversing Valve on a Heat Pump . . . . . 19
Changing a Compressor on a Sealed Refrigeration System . . . 19
Charging a Unit Using Scales or a Charging Cylinder . . . . . . . . . 19
Charging a System with a Charging Cylinder . . . . . . . . . . . . . . . . 20
ยฉ 2019 Cengage Learning. All Rights Reserved. May not be scanned, copied,
or duplicated, or posted to a publicly accessible website, in whole or in part.
Charging a System with Refrigerant Using a Digital Scale . . . . 20
Charging a Fixed-Bore Split-Type Air-Conditioning System . . 20
Refrigerant Recovery . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 21
Chapter 10
Gauge Installation and Removal on Systems Equipped with
Service Valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
Hermetic Compressor Changeout . . . . . . . . . . . . . . . . . . . . . . . . . . . 23
Changing a Four-Way Reversing Valve on a Heat Pump . . . . . 23
Gauge Installation and Removal on Systems Equipped with
Service Valves . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 24
Changing a Hermetic Compressor . . . . . . . . . . . . . . . . . . . . . . . . . . 24
Changing an Evaporator in an Air-Conditioning System . . . . . 24
Charging a Freezer Using a Measured Charge . . . . . . . . . . . . . . . 25
Removing the Moisture from a Refrigerator After an
Evaporator Leak . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 25
Changing a Compressor on a Sealed Refrigeration System . . . 25
Charging a Unit Using Scales or a Charging Cylinder . . . . . . . . . 25
Charging a System with a Charging Cylinder . . . . . . . . . . . . . . . . 26
Charging a System with Refrigerant Using a Digital Scale . . . . 26
Charging a Fixed-Bore Split-Type Air-Conditioning System . . 26
Charging a TVX Air-Conditioning System with Refrigerant . . 27
Chapter 11
Calibrating Thermometers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
Checking the Accuracy or Calibration of Electrical Instruments
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 29
Chapter 12
Taking Voltage and Amperage Readings . . . . . . . . . . . . . . . . . . . . 30
Measuring Electrical Characteristics and Performing Electrical
Calculations . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
Electrical Load Identification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 30
ยฉ 2019 Cengage Learning. All Rights Reserved. May not be scanned, copied,
or duplicated, or posted to a publicly accessible website, in whole or in part.
Series Circuits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
Parallel Circuits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 31
Series and Parallel Circuits . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 32
Electrical Symbols Used in the HVAC Industry . . . . . . . . . . . . . . 32
Reading Basic Schematic Diagrams . . . . . . . . . . . . . . . . . . . . . . . . . 34
Reading Advanced Schematic Diagrams . . . . . . . . . . . . . . . . . . . . 36
Drawing Basic Diagrams . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 38
Transformers . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
Measuring the Amperage of Furnace or Air Handler Blower
Motors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 40
Troubleshooting Exercise: Electric Furnace . . . . . . . . . . . . . . . . . 40
Changing a Sequencer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
Electric Heating Controls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 41
Chapter 13
Automatic Controls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42
Bimetal Switches . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 42
Chapter 14
Controlling Temperatures . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
Low-Voltage Thermostats . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
Line-Voltage Thermostats . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 43
Pressure Switches . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
Pressure-Sensing Devices . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 44
Controlling the Head Pressure in a Water-Cooled Refrigeration
System . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 45
Troubleshooting Pressure Switches . . . . . . . . . . . . . . . . . . . . . . . . 45
Chapter 15
Reading Advanced Schematic Diagrams . . . . . . . . . . . . . . . . . . . . 46
Setting the Heat Anticipator for an Electric Furnace . . . . . . . . . 47
Air-Conditioning Circuit Evaluation . . . . . . . . . . . . . . . . . . . . . . . . 48
ยฉ 2019 Cengage Learning. All Rights Reserved. May not be scanned, copied,
or duplicated, or posted to a publicly accessible website, in whole or in part.
Troubleshooting Simple Electric Circuits . . . . . . . . . . . . . . . . . . . 48
Troubleshooting Electric Circuits . . . . . . . . . . . . . . . . . . . . . . . . . . . 48
Troubleshooting Thermostats . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49
Power Circuit Wiring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 49
Low-Voltage Control Circuit Wiring . . . . . . . . . . . . . . . . . . . . . . . . 49
Wiring an Air-Conditioning Packaged Unit . . . . . . . . . . . . . . . . . . 49
Wiring a Split System with a Fan Coil Unit . . . . . . . . . . . . . . . . . . 50
Wiring a Split-System Air-Conditioning Unit with a Gas Furnace
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 50
Wiring a Split-System Heat Pump . . . . . . . . . . . . . . . . . . . . . . . . . . . 50
Chapter 16
Direct Digital Controls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 52
Smart Thermostats . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 53
Chapter 17
Air-Conditioner Component Familiarization . . . . . . . . . . . . . . . . 54
Identification of Electric Motors . . . . . . . . . . . . . . . . . . . . . . . . . . . . 54
Compressor Winding Identification . . . . . . . . . . . . . . . . . . . . . . . . . 54
Identifying Types of Electric Motors . . . . . . . . . . . . . . . . . . . . . . . . 55
Single-Phase Electric Motors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55
Three-Phase Electric Motors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 55
Electronically Commutated Motors . . . . . . . . . . . . . . . . . . . . . . . . . 56
Hermetic Compressor Motors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 56
Starting Relays for Single-Phase Electric Motors . . . . . . . . . . . . 57
Troubleshooting Contactors and Relays . . . . . . . . . . . . . . . . . . . . 57
Replacing an Electric Motor on a Furnace or Air Handler . . . . 57
Changing a Fan Motor on a Gas Furnace . . . . . . . . . . . . . . . . . . . . 58
Testing a Compressor Electrically . . . . . . . . . . . . . . . . . . . . . . . . . . 58
ยฉ 2019 Cengage Learning. All Rights Reserved. May not be scanned, copied,
or duplicated, or posted to a publicly accessible website, in whole or in part.
Chapter 18
Motor Application and Features . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
Electric Motor Bearings and Drives . . . . . . . . . . . . . . . . . . . . . . . . . 59
Removing the Moisture from a Refrigerator After an
Evaporator Leak . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 59
Chapter 19
Identification of a Relay, Contractor, and Starter . . . . . . . . . . . . 60
Contractors and Relays . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60
Overloads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 60
Troubleshooting Contactors and Relays . . . . . . . . . . . . . . . . . . . . 61
Troubleshooting Overloads . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61
Electric Heating Controls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 61
Chapter 20
Hermetic Compressor Motors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62
Capacitors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 62
Belt-Driven Blower Assemblies . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63
Troubleshooting Electric Motors . . . . . . . . . . . . . . . . . . . . . . . . . . . 63
Megohmmeter Usage . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 63
Testing a Compressor Electrically . . . . . . . . . . . . . . . . . . . . . . . . . . 64
Chapter 21
Evaporator Functions and Superheat . . . . . . . . . . . . . . . . . . . . . . . 65
Evaluating Evaporator Performance . . . . . . . . . . . . . . . . . . . . . . . . 65
Checking an Evaporator During a Hot Pulldown . . . . . . . . . . . . 65
Refrigerant Temperature Applications . . . . . . . . . . . . . . . . . . . . . 66
Chapter 22
Condenser Functions and Desuperheat . . . . . . . . . . . . . . . . . . . . . 67
Air-Cooled Condenser Performance . . . . . . . . . . . . . . . . . . . . . . . . 67
Evaluation of a Water-Cooled Condenser . . . . . . . . . . . . . . . . . . . 67
Determining the Correct Head Pressure . . . . . . . . . . . . . . . . . . . . 68
Chapter 23
Compressor Operating Temperatures . . . . . . . . . . . . . . . . . . . . . . 69
ยฉ 2019 Cengage Learning. All Rights Reserved. May not be scanned, copied,
or duplicated, or posted to a publicly accessible website, in whole or in part.
Compressor Efficiency . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 69
Hermetic Compressor Changeout . . . . . . . . . . . . . . . . . . . . . . . . . . 69
Chapter 24
Evaluating a Thermostatic Expansion Device . . . . . . . . . . . . . . . 70
Capillary Tube System Evaluation . . . . . . . . . . . . . . . . . . . . . . . . . . 70
Troubleshooting Exercise: Refrigeration System Operation . 70
Changing a Thermostatic Expansion Valve . . . . . . . . . . . . . . . . . . 71
Chapter 25
Pumping Refrigerant into the Receiver . . . . . . . . . . . . . . . . . . . . . 72
Adjusting the Crankcase Pressure Regulator (CPR) Valve . . . 72
Chapter 26
Application and Evaluation of a Refrigeration System . . . . . . . 73
Chapter 27
Icemaker Data and Familiarization . . . . . . . . . . . . . . . . . . . . . . . . . 74
Icemaking Methods . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74
Cleaning and Sanitizing an Ice Machine . . . . . . . . . . . . . . . . . . . . . 74
Commercial Ice Cube Machines . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 74
Chapter 29
Refrigerant Temperature Applications . . . . . . . . . . . . . . . . . . . . . 76
Chapter 30
Determining Airflow (Cfm) by Using the Air Temperature Rise
Across an Electric Furnace . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77
Electric Furnace Familiarization . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77
Determining Airflow (CFM) by Using the Air Temperature Rise
Method: Electric Furnace . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 77
Low-Voltage Control Circuits Used in Electric Heat . . . . . . . . . . 77
Checking a Package Sequencer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 78
Checking Electric Heating Elements Using an Ammeter . . . . . 78
Troubleshooting Exercise: Electric Furnace . . . . . . . . . . . . . . . . . 78
Changing a Sequencer . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 79
Electric Heating Controls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 79
Chapter 31
Gas Furnace Familiarization . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80
ยฉ 2019 Cengage Learning. All Rights Reserved. May not be scanned, copied,
or duplicated, or posted to a publicly accessible website, in whole or in part.
Identification of the Flame or Pilot Safety Feature of a Gas
Furnace . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80
Gas Valve, Blower Motor, Blower Assembly, and Draft Analysis
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 80
Wiring for a Gas Furnace . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81
Maintenance of Gas Burners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 81
Testing the Flue on a Natural Draft Furnace . . . . . . . . . . . . . . . . . 81
Combustion Analysis of a Gas Furnace . . . . . . . . . . . . . . . . . . . . . . 82
Determining Airflow (Cfm) Using the Air Temperature Rise
Method: Gas Furnace . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 82
Main Burner, Ignition System, Flame Sensing System, Fan and
Limit Control, Transformer, and Thermostat Analysis . . . . . . . 82
Troubleshooting Exercise: Gas Furnace . . . . . . . . . . . . . . . . . . . . . 83
Changing a Gas Valve on a Gas Furnace . . . . . . . . . . . . . . . . . . . . . 83
Testing Ignition Controls and Measuring Flame Rectification
Signals . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 83
Testing Furnace Safety Controls . . . . . . . . . . . . . . . . . . . . . . . . . . . . 84
Multifunction Solid-State Modules . . . . . . . . . . . . . . . . . . . . . . . . . . 84
Gas Heating Controls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 84
Troubleshooting Heating Controls . . . . . . . . . . . . . . . . . . . . . . . . . . 85
Chapter 32
Familiarization with Oil Furnace Components . . . . . . . . . . . . . . 86
Oil Burner Maintenance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 86
Electronic Controls for Oil Burners . . . . . . . . . . . . . . . . . . . . . . . . . 86
Checking the Fan and Limit Control . . . . . . . . . . . . . . . . . . . . . . . . . 86
Adjusting an Oil Burner Pump Pressure . . . . . . . . . . . . . . . . . . . . 87
Combustion Analysis of an Oil Burner . . . . . . . . . . . . . . . . . . . . . . 87
Troubleshooting Exercise: Oil Furnace . . . . . . . . . . . . . . . . . . . . . . 87
ยฉ 2019 Cengage Learning. All Rights Reserved. May not be scanned, copied,
or duplicated, or posted to a publicly accessible website, in whole or in part.
Oil Heating Controls . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 88
Chapter 33
Filling a Hot-Water Heating System . . . . . . . . . . . . . . . . . . . . . . . . . 89
Determining Expansion Tank Pressure . . . . . . . . . . . . . . . . . . . . . 89
Near-Boiler Piping Component Identification . . . . . . . . . . . . . . . 89
System Configuration Identification . . . . . . . . . . . . . . . . . . . . . . . . 90
Mechanical-Draft Cooling Tower Evaluation . . . . . . . . . . . . . . . . 90
Chapter 34
Heat Recovery Ventilators (HRVs) and Energy Recovery
Ventilators (ERVs) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91
Humidification . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91
Heat Recovery Ventilators (HRVs) . . . . . . . . . . . . . . . . . . . . . . . . . . 91
Electronic Air Cleaners . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 91
Chapter 35
Comfort Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 92
Heat Recovery Ventilators (HRVs) and Energy Recovery
Ventilators (ERVs) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 92
Plotting an Air-Conditioning Process on a Psychrometric Chart
(Part 1 of a Two-Part Exercise) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 92
Calculating Total Heat, Sensible Heat, and Latent Heat (Part 2
of a Two-Part Exercise) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 92
Heat Recovery Ventilators (HRVs) . . . . . . . . . . . . . . . . . . . . . . . . . 93
Using Manufacturer’s Information to Check a Heat Pump
System’s Performance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 93
Mechanical-Draft Cooling Tower Evaluation . . . . . . . . . . . . . . . . 93
Chapter 36
Air-Conditioner Component Familiarization . . . . . . . . . . . . . . . . 95
Chapter 37
Heat Recovery Ventilators (HRVs) and Energy Recovery
Ventilators (ERVs) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 96
Using Duct Charts to Evaluate Duct Systems . . . . . . . . . . . . . . . . 96
Airflow Measurements . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 97
ยฉ 2019 Cengage Learning. All Rights Reserved. May not be scanned, copied,
or duplicated, or posted to a publicly accessible website, in whole or in part.
Measuring the Amperage of Furnace or Air Handler Blower
Motors . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 97
Electric Motor Bearings and Drives . . . . . . . . . . . . . . . . . . . . . . . . . 97
Mechanical-Draft Cooling Tower Familiarization . . . . . . . . . . . . 98
Chapter 38
Power Circuit Wiring . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 99
Low-Voltage Control Circuit Wiring . . . . . . . . . . . . . . . . . . . . . . . . 99
Wiring an Air-Conditioning Packaged Unit . . . . . . . . . . . . . . . . . . 99
Wiring a Split System with a Fan Coil Unit . . . . . . . . . . . . . . . . . . 99
Wiring a Split-System Air-Conditioning Unit with a Gas Furnace
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100
Wiring a Split-System Heat Pump . . . . . . . . . . . . . . . . . . . . . . . . . 100
Using the Halide Leak Detector . . . . . . . . . . . . . . . . . . . . . . . . . . . . 100
Using Electronic Leak Detectors . . . . . . . . . . . . . . . . . . . . . . . . . . . 101
Evaluating an Air-Conditioning Installation . . . . . . . . . . . . . . . . 101
Start-Up and Checkout of an Air-Conditioning System . . . . . 101
Chapter 40
Refrigerant Temperature Applications . . . . . . . . . . . . . . . . . . . . 103
Condenser Operating Conditions . . . . . . . . . . . . . . . . . . . . . . . . . . 103
Chapter 41
Evaporator Operating Conditions . . . . . . . . . . . . . . . . . . . . . . . . . 105
Manufacturer’s Charging Procedure . . . . . . . . . . . . . . . . . . . . . . . 105
Charging a System in the Field Using Typical Conditions (FixedBore Metering Device) . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 105
Charging a System in the Field Using Typical Conditions
(Thermostatic Expansion Valve) . . . . . . . . . . . . . . . . . . . . . . . . . . 105
Troubleshooting Exercise: Central Air-Conditioning with FixedBore Metering Device . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 106
Troubleshooting Exercise: Central Air-Conditioning with
Thermostatic Expansion Valve . . . . . . . . . . . . . . . . . . . . . . . . . . . . 106
ยฉ 2019 Cengage Learning. All Rights Reserved. May not be scanned, copied,
or duplicated, or posted to a publicly accessible website, in whole or in part.
Changing a Hermetic Compressor . . . . . . . . . . . . . . . . . . . . . . . . . 106
Changing an Evaporator in an Air-Conditioning System . . . . 106
Troubleshooting Refrigeration, Heating, or Air-Conditioning
Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 107
Troubleshooting Refrigeration, Heating, or Air-Conditioning
Systems . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 107
Chapter 42
Gross Wall Area and Net Wall Area Calculations . . . . . . . . . . . 109
Determining the Heat Transfer Rate Through a Wall . . . . . . . 109
Heat Loss Exercise . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 109
Chapter 43
Familiarization with Air-to-Air Heat Pump System Components
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 111
Using Manufacturer’s Information to Check a Heat Pump
System’s Performance . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 111
Heat Pump Performance Check in Cooling Mode . . . . . . . . . . . 111
Checking the Control Circuit in the Emergency and Auxiliary
Heat Modes . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 112
Checking the Four-Way Valve During the Heating and Cooling
Cycles . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 112
Wiring a Split-Type Heat Pump System . . . . . . . . . . . . . . . . . . . . 112
Checking Low-Voltage Field Control Circuits at the Individual
Components . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 112
Troubleshooting Exercise: Heat Pump . . . . . . . . . . . . . . . . . . . . . 113
Troubleshooting Exercise: Heat Pump . . . . . . . . . . . . . . . . . . . . . 113
Wiring a Split-System Heat Pump, Low-Voltage Control Wiring
. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 113
Chapter 44
Familiarization with Geothermal Heat Pumps . . . . . . . . . . . . . 115
Checking the Water Flow, Geothermal Heat Pumps . . . . . . . . 115
Chapter 45
Domestic Refrigerator Familiarization . . . . . . . . . . . . . . . . . . . . 116
ยฉ 2019 Cengage Learning. All Rights Reserved. May not be scanned, copied,
or duplicated, or posted to a publicly accessible website, in whole or in part.
Domestic Freezer Familiarization . . . . . . . . . . . . . . . . . . . . . . . . . 116
Charging a Refrigerator Using the Frost-Line Method . . . . . . 116
Charging a Freezer by the Frost-Line Method . . . . . . . . . . . . . . 116
Refrigerator Operating Conditions During a Hot Pulldown . 117
Freezer Gasket Examination . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 117
Troubleshooting Exercise: Refrigerator . . . . . . . . . . . . . . . . . . . 117
Removing the Moisture from a Refrigerator After an
Evaporator Leak . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 117
Changing a Compressor on a Sealed Refrigeration System . 118
Chapter 46
Window Air Conditioner Familiarization . . . . . . . . . . . . . . . . . . 119
Checking the Charge Without Gauges . . . . . . . . . . . . . . . . . . . . . . 119
Charging a Window Unit by the Sweat-Line Method . . . . . . . 119
Charging a Unit Using Scales or a Charging Cylinder . . . . . . . 119
Chapter 47
Chilled-Water System Familiarization . . . . . . . . . . . . . . . . . . . . . 121
Chiller Barrel Approach Temperature . . . . . . . . . . . . . . . . . . . . . 121
Chapter 48
Mechanical-Draft Cooling Tower Familiarization . . . . . . . . . . 122
Mechanical-Draft Cooling Tower Evaluation . . . . . . . . . . . . . . . 122
Chapter 49
Using a Heat Exchanger Pressure-Drop Chart . . . . . . . . . . . . . . 123
Using a Megger (Megohmmeter) . . . . . . . . . . . . . . . . . . . . . . . . . . 123
Chapter 50
Packaged Air Conditioner Familiarization . . . . . . . . . . . . . . . . . 124
Hand Signals for Communicating with the Crane Operator . 124
Variable Air Volume (VAV) Box Familiarization . . . . . . . . . . . . 124
ยฉ 2019 Cengage Learning. All Rights Reserved. May not be scanned, copied,
or duplicated, or posted to a publicly accessible website, in whole or in part.
Chapter 1
COMPLETED TEMPERATURE CONVERSION CHART FROM TEMPERATURE
CONVERSIONS
(Bolded values in parentheses represent the items that were to be filled in by the student.)
Fahrenheit
Celsius
Rankine
Kelvin
(โ460)
(โ273)
0
(0)
32
(0)
(492)
(273)
(212)
100
(672)
(373)
(140)
(60)
600
(333)
(โ460)
(โ273)
(0)
0
200
(93)
(660)
(366)
(โ360)
(โ218)
(55)
(122)
(323)
(81)
50
(27)
100
(582)
(541)
300
(32)
0
(492)
(273)
150
(66)
(610)
(339)
(โ410)
(โ246)
50
(27)
(โ40)
โ40
(420)
(233)
โ40
(โ40)
(420)
(233)
212
(100)
(672)
(373)
(212)
(100)
(672)
373
(โ460)
โ273
(0)
(0)
(212)
(100)
672
(373)
5
(โ15)
(465)
(258)
(441)
(227)
(901)
500
ANSWERS TO QUESTIONS IN TEMPERATURE CONVERSIONS
1.
2.
3.
4.
5.
6.
D.
C.
A.
A.
A.
C.
ANSWERS TO QUESTIONS IN THE BRITISH THERMAL UNIT
1.
2.
3.
4.
A.
A.
D.
B.
ยฉ 2019 Cengage Learning. All Rights Reserved. May not be scanned, copied,
or duplicated, or posted to a publicly accessible website, in whole or in part.
1
Chapter 1
ANSWERS TO QUESTIONS IN HEAT TRANSFER BY CONDUCTION
1.
2.
3.
B.
B.
Substances that are good conductors of electricity also tend to be good conductors of heat.
ยฉ 2019 Cengage Learning. All Rights Reserved. May not be scanned, copied,
or duplicated, or posted to a publicly accessible website, in whole or in part.
2
Document Preview (15 of 408 Pages)
User generated content is uploaded by users for the purposes of learning and should be used following SchloarOn's honor code & terms of service.
You are viewing preview pages of the document. Purchase to get full access instantly.
-37%
Solution Manual For Refrigeration and Air Conditioning Technology, 8th Edition
$18.99 $29.99Save:$11.00(37%)
24/7 Live Chat
Instant Download
100% Confidential
Store
Benjamin Harris
0 (0 Reviews)
Best Selling
The World Of Customer Service, 3rd Edition Test Bank
$18.99 $29.99Save:$11.00(37%)
Chemistry: Principles And Reactions, 7th Edition Test Bank
$18.99 $29.99Save:$11.00(37%)
Test Bank for Hospitality Facilities Management and Design, 4th Edition
$18.99 $29.99Save:$11.00(37%)
Solution Manual for Designing the User Interface: Strategies for Effective Human-Computer Interaction, 6th Edition
$18.99 $29.99Save:$11.00(37%)
Data Structures and Other Objects Using C++ 4th Edition Solution Manual
$18.99 $29.99Save:$11.00(37%)
2023-2024 ATI Pediatrics Proctored Exam with Answers (139 Solved Questions)
$18.99 $29.99Save:$11.00(37%)